This site uses cookies: please see our Privacy and Cookie Policy or ALLOW COOKIES
Home ›
Case Studies
Churches
Care Homes
Other
We bring exceptional talent, experience and knowledge to all our projects and see good design and products the key to our success.
HC One Care Homes reactive response SLA
A reactive contract to cover 85 homes on a 4 hour response. The area covered is from Northumberland across to the lake district and down to Lincolnshire.
Jack Dormand Care Home
Jack Dormand care home need to simplify their hot water system and to move the existing hot water storage cylinders to a more accessible location.
Millfield Medical Centre
The Millfield Medical Centre on Hylton Road, Sunderland, had an aging boiler system that needed replacing.
New Seaham Conservative Club
ODIN Services were approached by the club committee as they wanted to upgrade their existing inefficient gas boiler with a new condensing boiler.
St Andrews Church Dalton le Dale
ODIN Services were approached by the church committee as they wanted to upgrade their existing oil-fired heating system and replace it with a modern gas fired condensing boiler along with convector type radiators.
Murton Independent Methodist Church
The church diocese had made it top of their agenda to bring a new lease of life into the church by wanting to install a new central heating boiler and new radiators and pipework after 5 decades of using the old system.
Hawthorn Court Care Home
Replacement of a gas fired water heater which had been unreliable and was also very costly to repair. Due to the issues this caused, the home was frequently left without hot water.
Alexander Court Care Home
Receiving a 4 hour response callout to attend site due to a burst boiler, the home was in desperate need of replacing the existing plant due to being an uneconomical repair at short notice.
North Harbour Apartments
ODIN Services were appointed mechanical contractor after a successful tender procedure. Installing all new plumbing services, boilers, heating and bathrooms across all 9 luxury apartments.
Maryport Town Hall
The existing plant and equipment servicing this busy town hall was expensive to run and unreliable.
Newcastle Golf Club Modernisation
ODIN Services were appointed mechanical contractor to carry out a new boiler room installation as well as upgrading the hot water system, sanitaryware and the gas supply for the commercial kitchen.
Christ Church New Seaham
ODIN Services sourced and installed a plate heat exchanger alongside the new gas fired condensing boiler to prevent old water from the existing radiators and pipework contaminating the new boiler.